The biogas plant in Taroudant is planned to be installed near to a waste water treatment plant owned and operated by the client. The client is producing milk products, fruits and is also starting to construct a slaughter house.
All organic waste streams together with the sewage sludge and some agricultural biomass are used to produce through the anaerobic digestion a maximum of renewable energies.
The enormous heat and electricity demand of the client will be partly produced thanks to the biogas plant. To reach a maximum efficiency of the project, the biogas produced in the biogas plant, which is at about 1000 meters from the industrial site away, will be transported by a simple low pressure gas pipe to the decentralized combined heat and power unit which will be placed directly in the industrial site near to the heat consumers.
The final output after the anaerobic process will be transformed, thanks to a post-composting process, into a high quality fertilizer which will create added value.
Basic information | Name of the legal entity: | L.E.E. SÀRL | |
Country: | Marocco | ||
Project value (EUR): | 48.000,- | ||
Client: | Copag Coopérative agricole | ||
Origin of fundings: | private | ||
Dates (start-end): | 2011 - ongoing |
Input Material |
Agricultural biomass: | 20.000 tons/year |
Sewage sludge: | 45.000 tons/year | |
Agro-industrial waste: | 6.400 tons/year | |
Technical Data |
Technology employed: | biogas (anaerobic digestion) |
Electrical capacity installed: | 1.000 kWel | |
Digesters: | 2 x 2.200 m³ | |
Post-digesters: | 2 x 2.200 m³ | |
Others: | Post-composting and ecofertiliser | |
Energy | Biogas production: | 3.300.000 m³/year |
Electrical production: | 7.000.000 kWhel./year | |
Heat production: | 8.000.000 KWhth/year | |
Heat consumption client: | 6.500.000 KWhth/year | |
Ecofertiliser: | 8.300 tons/year | |
Services provided | Project planning: |
Feasibility study |
Mass and energy balances |